io.github.theluckystrike/change-order

McpStamp Change Orders

Change orders against quotes and work orders: line changes, approval, running contract value.

Endpointhttps://mcp.zovo.one/mcp/change-order (streamable-http)
Registry version0.23.0
Now11 tools · grade A (91) · pin ts_13bec973598a2fa5dd61962c7a5f8fff · protocol 2025-06-18
First / last listed2026-11-02 06:08 UTC / 2026-11-02 06:08 UTC
Grade over time2026-11-02: A (91), 11 tools

Is this your server? Own a server? ToolFit hosted watch re-checks it every 24 h ($0.25 per 30 days) or 6 h ($0.60) and sends you an HMAC-signed webhook when its tools or grade change: POST https://api.youraitools.co/toolfit/v1/watch. To opt out, see About & opt-out.

Timeline

First listing · 2026-11-02 06:08 UTC
11 tools, grade A (91)

Tools: change_order_create change_order_add_line change_order_status change_order_get change_order_list change_order_delete contract_value change_order_document change_order_invoice_payload license_status license_activate

Current tools (11)

change_order_createRaise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.
params: reference*, reference_kind, client*, title*, date, currency, original_value_minor, note, duplicate_ok
change_order_add_lineAdd one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.
params: change_order*, kind*, description*, quantity*, unit_price_minor*, was_quantity, was_unit_price_minor, reason*, date, tax_rate, note
change_order_statusMove one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.
params: change_order*, status*, date, note
change_order_getReturn one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.
params: change_order*
change_order_listList change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.
params: reference, status, client, from, to, limit
change_order_deleteDelete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.
params: change_order*
contract_valueThe running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.
params: reference*
change_order_documentRender one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.
params: change_order*
change_order_invoice_payloadBuild the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.
params: change_order*, issue_date, tax_rate
license_statusReport this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.
params: none
license_activateTurn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.
params: key*

Entries describe changes in tool definitions. They are not statements about a server, its quality or its author. The grade measures how the tool definitions fit model providers (token cost, schema compatibility, confusable names) as scored by the ToolFit engine at the time of the listing. JSON: append .json. Opt-out: how or hello@youraitools.co.